Tadge & Harlan share about the 2020 & 2021 Model Years (with graphics)
Just a few highlights from today's NCM Bash presentation by Tadge Jeuchter and Harlan Charles...
2020 MY
The 2020 MY will be extended to build as many existing 2020 orders as possible, but they may not be able to build all of the 2020 MY orders that have been submitted
Supplier production ability will ultimately determine how many of these they will be able to buil
2021 MY
2021 MY orders will probably start being accepted in late July, 2020
2021 MY base price on the coupe and convertible will remain unchanged, but there may be some changes in options pricing
New Color for 2021 - Silver Flare Metallic - Tadge described as having the appearance of "liquid metal"
New Color for 2021 - Red Mist Tint Coat Metallic - Tadge described as a "fiery" red and has ordered his 2021 CTF car in this color
FE2 Magnetic Selective Ride Control available on non-Z51
NOTE: The 20,181, represents 2020 MY orders that have been accepted into the ordering system by Chevrolet.
NOTE: The 20,181, represents 2020 MY orders that have been accepted into the ordering system by Chevrolet.
Last edited by E.T.D. Corvettes; 05-29-2020 at 03:38 PM.
So does the 20,000+ "accepted orders" include all of those at status 1100, or just those at 3000 and above?
They'd have to produce nearly 800 per week between now and November to get through these... They must be assuming a 2nd shift.
So does the 20,000+ "accepted orders" include all of those at status 1100, or just those at 3000 and above?
They'd have to produce nearly 800 per week between now and November to get through these... They must be assuming a 2nd shift.
Good question need facts is this 1100+ orders we all want to know.
So does the 20,000+ "accepted orders" include all of those at status 1100, or just those at 3000 and above?
They'd have to produce nearly 800 per week between now and November to get through these... They must be assuming a 2nd shift.
I think that also includes the approximately 3,000 or so already produced.
It’s quite possible they can produce another 17,000 in 5 months assuming no more shutdowns.
Great info. Thanks! Also curious if the 20k orders included 1100 Status orders.
Originally Posted by C8Jake
NO
My opinion is YES Jake i would like to see your math.....
2700 made and everyone says there are around 9,000 at 3000 and up so then that is a total of 11,700 where are the other 9,000 coming from?
Well looks like i am getting a 2021.... as my order was placed right after the shutdown and the system was already closed down so i am not even at 1100